Scheduled Maintenance, Longreach 50M Pool: 24 May - 14 Jun 2021

Back

Due to the replacement and maintenance of pool filtration equipment, the 50 metre pool at the Longreach Aquatic Centre will be closed temporarily for two weeks from 24 May through to 14 June inclusive.

The Longreach Aquatic Centre will remain open and the 25 metre pool will be available for use during this time.

We thank swimmers for their understanding as we complete these scheduled maintenance works.